1. Content of bidding: lighting control system and lighting procurement
2. Registration conditions:
1) The bidder must have independent legal personality; provide 3C certification or test report for the lighting products;
2) A power of attorney from the major equipment manufacturer and an after-sales commitment from the manufacturer to the purchaser are required.
3) Equipment manufacturers have the ability to manufacture (or represent), install, commission and after-sales service of large stadium lighting system equipment.
4) The bidding brand must have similar engineering performance within three years.
5) Product declaration form for major components.
3. At the time of registration (simultaneous pre-qualification), bring the unit's introduction letter, the legal representative's right to grant the book and the original and photocopy of the above materials. No originals will not be accepted for registration; please register the copy of the relevant qualification documents into a booklet.
4. The tenderee will select potential bidders by examining the qualifications, reputation and performance of the applicant.
5. After the unit that passed the qualification review receives the notice from our company, we will go to our company to purchase the bidding documents. If there are many units applying for pre-qualification, the tenderee and the tendering agency will determine the short-listed units according to the principle of selection. For applicants who have not passed the pre-qualification or qualified pre-qualification conditions but are not short-listed, the tenderee and the tendering agency will not Any explanation.
6. Registration time: March 31 to April 4, 2009, 9:00-11:00 am. 14:00-16:00 pm (no holidays)
7. If the bidder needs to consult for this bidding, he can contact us by letter, letter (fax) or telephone.
Tendering agency: Shanghai United Engineering Supervision Cost Consulting Co., Ltd.
8. The time for the purchase of the bidding documents will be announced separately. Company Name: Shanghai United Engineering Supervision Cost Consulting Co., Ltd. Contact: Wu Tel: 13913950475 E-mail: Fax: 025-84514251 Postal Code: 210002 Address: 8th Floor, No. 448, Zhongshan East Road
low voltage electric appliances is a kind of equipment that can manually or automatically connect and disconnect the circuit,according to the requirements of the outside . In order to realize the circuit or non-electric object switching, control, protection, detection, transformation and adjustment. Korlen electrical appliances can provide the perfect(quality and service) products with good safety: AC Contactor,Thermal Relay,Manual Motor Startor etc.
AC contactor:
pe |
KNC1-09 |
KNC1-12 |
KNC1-18 |
KNC1-25 |
KNC1-32 |
KNC1-40 |
KNC1-50 |
KNC1-65 |
KNC1-80 |
KNC1-95 |
||
Pick-up voltage |
(0.85~ |
(0.85~ |
(0.85~ |
(0.85~ |
(0.85~ |
(0.85~ |
(0.85~ |
(0.85 |
(0.85~ |
(0.85~ |
||
Release voltage |
(0.2~ |
(0.2~ |
(0.2~ |
(0.2~ |
(0.2~ |
(0.2~ |
(0.2~ |
(0.2~ |
(0.2~ |
(0.2~ |
||
Coil power |
50Hz |
Pick-up(VA) |
70 |
70 |
110 |
110 |
110 |
200 |
200 |
200 |
200 |
200 |
Holding(VA) |
8 |
8 |
11 |
11 |
11 |
20 |
20 |
20 |
20 |
20 |
||
Pick-up(VA) |
80 |
80 |
115 |
115 |
115 |
200 |
200 |
200 |
200 |
200 |
||
Holding(VA) |
8 |
8 |
11 |
11 |
11 |
20 |
20 |
20 |
20 |
20 |
||
Power |
1.8~2.7 |
1.8~2.7 |
3~4 |
3~4 |
3~4 |
6~10 |
6~10 |
6~10 |
6~10 |
6~ |
If you have any questions,please contact with us directly,welcome to visit our factory.For inquly.please send mail directly to us.
Low Voltage Transformer,Low Voltage Motors,Relay & Contactor
Wenzhou Korlen Electric Appliances Co., Ltd. , http://www.korlenelectric.com