1, tender conditions
The formal power use project at the first power point of the Lanqi Building in Qinhan New City has been approved by the Qha-2017-Z-004 Economic and Development Bureau of Qinhan New City in Xishan New District of Shaanxi Province. The bidder is the Qinhan New City Construction Project Management Center in Xixian New District of Shaanxi Province. Construction funds: self-raised, the project already has the conditions for tendering, and the construction of the project is now open for public bidding. Potential applicants with special wishes (hereinafter referred to as applicants) are invited to apply for prequalification.
2. Project Overview
The project is located at Lanchi 2nd Road, Xinhan Town, Qinhan, with a total capacity of 6500 kVA. It is laid along the Lanchi 2nd Road Municipal Cable Ditch to Lanchi Building, and it passes through the high-voltage power distribution room of the Lanchi Building Hospital.
3, the scope of tender
The scope of the tender for the first power point of the Lanchi Building, the official use of electricity construction drawings all the contents.
4, qualification requirements:
4.1. People who are registered in the territory of the People's Republic of China and have valid qualifications for an independent legal entity, have the ability to complete the legal person or other organization of the project and have an effective safety production license.
4.2. Qualified with Grade 3 or above qualification of general contractor of power engineering construction or Class 3 or above qualification of professional contractor of power transmission and transformation project, and also possess “Classification of Installation (Repair, Trial) Power Facilities Licenseâ€. Category 5 and above qualifications; in the past three years (2014 to present), there is a similar project construction performance (according to the contract signing time).
4.3. The project manager must have qualifications for qualified constructors of Grade 2 or above for mechanical and electrical engineering and an effective safety production assessment certificate. The unit is registered and there are no projects under construction.
4.4. In the same industry, there is good performance ability and credibility. In the past three years (from 2014 to now), no major quality accidents have been caused due to the quality of the company and safety responsibility. The personnel, equipment, and technology required to perform the contract have corresponding capabilities and timely, reliable, efficient, and high-quality service capabilities.
5, prequalification method
This prequalification uses a limited quantity system. When more than 9 applicants passed the detailed examination, the number of applicants who passed prequalification was limited to 9.
6. Acquisition of prequalification documents
6.1. Whoever intends to participate in bidding shall be available from 09:00 to 12:00 and from 14:00 to 17:00 daily (Beijing time) from March 16, 2017 to March 20, 2017. Same as below), register and purchase prequalification documents.
Non-rechargeable (primary) batteries are single-use electro chemical storage cells which produce electrical energy by means of a non-reversible chemical reaction, necessitating their disposal after once being depleted.
Primary batteries, also known as non-rechargeable batteries, tend to get overshadowed by the media attention secondary or rechargeable batteries receive. Heavy focus on one product over another may convince folks that primary batteries are old technology on the way out.
Primary batteries, also known as non-rechargeable batteries, tend to get overshadowed by the media attention secondary or rechargeable batteries receive. ... High specific energy, long storage times and instant readiness give primary batteries a unique advantage over other power sources.
Non-Rechargable Battries,Non-Rechargeable Button Cell Battery,Non-Rechargeable Alkaline Battery,Non-Rechargeable 1.5V Battery
Shenzhen Glida Electronics Co., Ltd. , https://www.szglida.com